Facilities & Construction procedures are under revision at this time. Any Standard Operating Procedure (SOP) that is listed below has been through the revision process. SOP's with an asterisk are policies that are in the process of becoming procedures. After a 30-day period of review and comment from the University community, they will move on through the approval process to officially become procedures. See the Policies website for more information regarding this process.
Administration
| SOP # |
Subject |
Revised |
| ADM-01 |
Monitoring & Evaluation of Utilities – Utilities Management Program |
July 2008 |
| ADM-02 |
Loss of Electrical Service |
July 2008 |
| ADM-03 |
Loss of Steam Pressure |
July 2008 |
| ADM-04 |
Loss of Domestic Water Supply |
July 2008 |
| ADM-05 |
Failure of Clinical Vacuum Pumps or Medical Air/Gas |
July 2008 |
| ADM-06 |
Failure of Air Handling Equipment |
July 2008 |
| ADM-15 |
Identification of Essential Facilities Equipment on Emergency Power Within Patient Care Areas |
July 2008 |
| ADM-41 |
Loss of Effluent Flow |
July 2008 |
| ADM-43 |
Loss of Natural Gas Supply |
July 2008 |
| ADM-53 |
Preventive Maintenance of Essential Equipment and Facilities |
July 2008 |
Back To Top
Central Control
| SOP # |
Subject |
Revised |
| CC-01 |
Centralized Building Automation System-Maintenance Program |
August 2008 |
| CC-07 |
Monitoring of Hot Water Temperature |
August 2008 |
| CC-10 |
Medical Gases |
August 2008 |
| CC-15 |
Operation of the Building Automation System |
August 2008 |
| CC-17 |
Hospital TB Room Fan Failure |
August 2008 |
| CC-18 |
Loss of Building Automation System |
August 2008 |
| CC-19 |
Monitoring of Computers |
August 2008 |
Back To Top
Electrical
| SOP # |
Subject |
Revised |
| E-01 |
Preventive Maintenance Electric Switchboards and Motor Control Centers |
October 2008 |
| E-02 |
Maintenance of Manual and Automatic Transfer Switches |
August 2008 |
| E-03 |
Preventive Maintenance on Electrical Distribution Panels |
August 2008 |
| E-04 |
Inspection of Electrical Receptacles |
August 2008 |
| E-05 |
Preventive Maintenance of Disconnects and Alternators |
October 2008 |
| E-06 |
Inspection of Heliport Lights |
August 2008 |
| E-07 |
Breaker Operational Tests at the UT HSC Main Sub-Station |
October 2008 |
| E-08 |
Transformers-Maintenance and Repair Procedures |
August 2008 |
| E-10 |
Maintenance of Emergency Battery Lights |
August 2008 |
| E-14 |
Preventive Maintenance of Electrical Line Isolation Panels |
August 2008 |
| E-15 |
Preventive Maintenance on D.C. Switchboard Batteries |
August 2008 |
| E-16 |
Inspection of Lightning Protection |
August 2008 |
Back To Top
General Maintenance
| SOP # |
Subject |
Revised |
| GM-17 |
Checking and Maintaining Fire Wall Integrity |
August 2008 |
Back To Top
Grounds
| SOP # |
Subject |
Revised |
| G-01 |
Snow Removal |
August 2008 |
| G-10 |
Removal of Ice from Roadways & Walkways |
September 2008 |
Back To Top
HVAC
| SOP # |
Subject |
Revised |
| HVAC-15 |
Maintenance on Computer Room Air Conditioners - HSC |
September 2008 |
| HVAC-19 |
DLAM Temperatures |
September 2008 |
Back To Top
Plumbing
| SOP # |
Subject |
Revised |
| P-01 |
Fire Pump Maintenance |
September 2008 |
| P-03 |
Maintenance of Vacuum Pumps |
September 2008 |
| P-04 |
Maintenance of Clinical Air Compressors |
September 2008 |
| P-05 |
Maintenance of Backflow Prevention Devices |
September 2008 |
| P-08 |
Maintenance of Emergency Showers & Emergency Eye Wash - HSC |
September 2008 |
| P-10 |
Sprinkler System Inspection - HSC |
September 2008 |
| P-12 |
Medical Gas Alarm Testing |
October 2008 |
| P-14 |
Medical Gas Piping Modification |
October 2008 |
Back To Top